Belfast Acute Mental Health Inpatient Centre

A project featuring 5 separate interconnecting buildings with 80 ensuite bedrooms.

Project Information

Sector:

Healthcare

Completion:

September 2019

Architect:

No Architect

Main Contractor:

Graham

The new Belfast Acute Mental Health Inpatient Facility provides a total 80 ensuite bedrooms (74 acute mental health ensuite bedrooms and 6 psychiatric intensive care beds) which are in 5 separate interconnecting buildings arranged around a cloistered central courtyard, communal areas and administration areas. All aspects of the design were carefully considered, including the colours, natural light, materials, furniture and fittings – to ensure that the surrounding environment helps to improve the overall service user experience.

Project Gallery

Check out of the photos showcasing our work on the project.

The Products Used

On this project we used a combination of the following products.